Home Page,www.plastemart.com
 PRODUCT SEARCH     PROCESSORS     PRICES     PLACEMENTS      EXHIBITIONS       DISCUSSION FORUM       ARTICLES       NEWS   
Go to->Home - Technical Articles & Reports on Plastic Industry
How Anjar will be built ?
 

As Anjar continues to be ravaged by thunder showers and strong winds and as buildings fall and life and property is destroyed, one can only wonder, how long will it take before peace prevails? And almost immediately our thoughts turn to the condition of the inhabitants of Gujarat, who in a short period of time have lost so much.

Interestingly, plastics offer a housing solution - Plastics Houses.
These house are durable and tough,
Can withstand earthquakes (upto seismic zone 5),
Are resistant to fire, tornadoes, hurricanes and cyclones (upto 160 kmph).
In addition, each house is guaranteed for 25 years - the guarantee covers the structure and all components (walls, roofs, doors, windows and trims).
Are resistant to fire, tornadoes, hurricanes and cyclones (upto 160 kmph).
A plastic house is also much more cost-effective than a bricks and mortar house. The construction cost is substantially lower and a plastic house is completely maintenance free, since it is free of warpage, cracks and plastering, is rust, leakage and termite proof and requires no painting. Thus the savings in maintenance cost vis-à-vis a conventional house itself pays for the cost of construction.

Recently, Reliance, came forward and handed over two houses to the Govt. of Gujarat. It takes just nine days to put up one complete house - a house that has a living room, bedroom, kitchen, bathroom and toilet. All its components - walls, windows, doors, roof, flooring are made of PVC. The walls, made of hollow profiles made from PVC, are filled with concrete.

Step by step photographs documenting the nine day construction process:

 Day 0   Day 1: Slab poured 
Day 2: Walls Take Shape Day 3: Door & Window Frames Installed 
Day 4: Walls braced to pour  Day 5: Walls filled with Concrete 
 Day 6: Roof Anchors Set  Day 7:  Roof Erected
 Day 8:  All Doors / Windows Fitted Day 9:  Ready for Occupation
Forward this article to friend Forward this article to friend Print this article Print this article  
Back to list of articles
 
Advertise With Us    Home    Information Mart    Newsletter    Environment      Articles   Polymer Prices
About Us    Jobs in Plastic Industry    Manufacturers Plastic Industry   Products & Services Plastics  Terms Of Use
Plastic Exhibitions And Trade Fairs   Disclaimer   Software Solutions   Contact Us  Site Map
Be fan of Plastemart.com on Facebook Be Our Fan | follow Plastemart.com on Twitter Follow Us
Best viewed in IE 6.0+
Copyright © 2003 Smartech Global Solutions Ltd. All rights reserved.
Designed & Conceptualized by Plastemart - www.plastemart.com