An application of Plastics in Housing- Part II
 

Building methods report card

**** - Excellent   *** - Good   ** - Satisfactory   * - Poor

Performance Formed/Poured Concrete Block Construction Wood Construction Plastics Construction
Volatile Organic Compound (VOC)

(Off-gassing)
** ** * <0.3mg/m3

***
Interior Air Quality (IAQ) ** ** * ****
Energy Performance(4)

(air tightness and thermal mass)
** ** * ****
Self-ignition temperature

(ASTM - D1929 )
** ** * 480° C/896° F

***
Flame Spread

(ASTM E84)
*** *** * 19

****
Smoke Development and Toxicity

(ASTM E84)
** ** ** 261

****

(4) Air Leakage is responsible for between 30%-40% of all cooling costs.

Design Formed/Poured Concrete Block Construction Wood Construction Plastics Construction
ISO 9001 Ceritfied No No No Yes
Design flexibility(walls) ** *** **** ****
Design flexibility (roof) *** *** *** **
Insulated Cathedral Roof No No No Yes
Roof Steel / Aluminium Reinforced No No No Yes
Interior / Exterior Wall Construction Concrete/Wood Block/Wood Wood/Wood Concrete/
Concrete
Interior/Exterior Cladding Required ? Yes Yes Yes No
Drywall Required Yes Yes Yes No
Ability to integrate with other building technologies/Methods Yes Yes Yes Yes
Multi-Level Construction Yes Yes No Yes
Residential/Commercial/
Industrial Applications
Yes Yes No Yes
Overall Building Strength *** *** * ****

Maintenance Formed/Poured Concrete Block Construction Wood  Construction Plastics Construction
Painting and Staining Required Yes Yes Always Never
Potential for Termites  Yes Yes Yes None
Resistance to Deterioration due to Vermin Infestation *** *** * ****
Waterproof No No No Yes
Mold & Mildew Resistance *** ** * ****
Rust and Rot Resistance *** ** * ****
Resistance to Hurricanes *** ** * ****
Resistance to Flood/Water Damage ** ** * ****
Overall Maintenance *** ** * ****

Overall Costs Formed/Poured Concrete Block Construction Wood Construction Plastics Construction
Cost to Design *** *** ** ***
Cost of Construction

(including soft costs)
** *** ** ***
Cost to Maintain ** ** * ****
Time to Build 6-9 months 6-9 months 4-5 months 2-3 months
Insurance Premiums # *** ** * ****
Overall Cost ** *** * ****

(#) Having withstood hurricane force winds with gusts up to 236mph and earthquakes up to 7.9 in the Richter Scale.

Forward this article to friend Forward this article to friend Print this article Print this article  
Back to list of articles